Kitchen Remodeling

Kitchens worth gathering in.

From a same-footprint refresh to a full open-concept reconfigure. Custom cabinets, slab countertops, restaurant-grade plumbing, and the pantry storage you've been dreaming about for a decade.

Get a free quote See packages
CFCC kitchen · oak cabinets, calacatta backsplash, sage island
Typical timeline

8 to 14 weeks, start to handover.

1
Consultation

Week 1 — Free in-home visit, measurements, listening.

2
Design

Weeks 2–4 — 3D renders, material boards, revisions.

3
Permits

Weeks 4–6 — We file, follow up, and clear inspections.

4
Build

Weeks 6–12 — Demo, rough-ins, install, finish.

5
Handover

Week 12+ — Walk-through, punch list, 1-yr warranty.

Behind the build

From demo day to handover.

Real photos from a recent kitchen — cabinets going in, finishes coming together, the day we hand over the keys. No staging, no stock photos.

Cabinet install in progress
Week 6 · Install
Cabinet boxes in, leveled, anchored.

Boxes set first, then doors and drawer fronts so we can adjust before reveals are fixed.

Kitchen with countertops, before final finish
Week 9 · Stone & tile
Countertops set. Tile up. Floors protected.

Painter's paper stays down through trim and appliances. New floors get covered until the day before walk-through.

Finished grey shaker kitchen with herringbone backsplash
Handover day
Cleaned, calibrated, keys back.

Final clean, appliances calibrated, drawers labeled, 1-year warranty in writing.

What we build

The full scope.

Whether you want to swap finishes or move a wall, we cover everything inside the kitchen envelope — design, demolition, build, and final.

Custom cabinetry

Inset, framed, slab — built locally to fit your space and your storage style.

Slab countertops

Quartzite, marble, quartz, soapstone. Direct slab-yard relationships, fabricated locally.

Range & ventilation

Pro ranges, custom hood inserts, make-up air, recirculating where venting isn't possible.

Walls & layout

Take down a wall, open to the dining room, add an island. Structural review included.

Plumbing & electrical

Re-route gas, water, drains, 220V appliance circuits. Permitted, inspected, signed off.

Lighting & smart

Layered lighting design, recessed + pendant + under-cabinet, dimmer scenes, optional smart.

Investment

Three packages.
One honest quote.

Every kitchen is different — so every quote is custom. Pick the package that sounds like your project, reach out, and we'll come measure and put a single honest number in writing.

Refresh

Reach out for a quote

Same footprint. Beautiful re-skin.


  • Replace cabinets & countertops
  • New tile backsplash
  • New sink, faucet, disposal
  • New appliances installed
  • Paint & flooring refresh
  • 4–6 week build window
Quote a Refresh

Remodeling

Reach out for a quote

Open concept. Architectural change.


  • Everything in Renovation, plus:
  • Wall removal (engineering incl.)
  • Open kitchen / living plan
  • Large island & pantry build-out
  • High-end appliance package
  • Window enlargement / new openings
  • 10–14 week build window
Quote a Remodeling

Every project is priced individually after a free in-home consultation. We'll listen, measure, and follow up with one fixed number — no allowances, no surprise change orders.

Common questions

Kitchen remodel FAQ.

How much does a kitchen remodel actually cost in the Bay Area?
Every kitchen is different — scope, layout, finishes, and existing conditions all move the number. After a free in-home consultation we hand you a detailed quote in writing within 7 days. No allowances, no surprise change orders. Reach out and we'll get specific.
Can I stay in the house during the remodel?
Yes — most clients do. We set up a temporary kitchenette (sink + microwave + induction burner) in another room, dust-tarp the work area, and do a daily site clean. About 60% of our clients stay home, 40% live elsewhere for the cabinet install + finish weeks.
Do you handle permits and inspections?
We file with your city and attend all required inspections. Permitting responsibility varies by project — we outline exactly what is needed in your quote and handle as much of it as possible.
Do you do design, or do I bring my own designer?
We work both ways. If you have a designer, we build to their plans. If you do not, we can recommend trusted local designers we have worked with, or help you make selections ourselves on straightforward projects. Either way, we are flexible.
What's your warranty?
We stand behind our work with a 1-year workmanship warranty on everything our crew touches. If something we built fails within that year, we come back and fix it at no cost to you. Manufacturer warranties on appliances, cabinets, and stone pass through directly to you.
Do you only do kitchens and bathrooms?
Kitchens and bathrooms are our specialty — it's where we do our sharpest work, and where most of our clients come to us. That said, we're happy to take on related projects too. If you've got something in mind, reach out and let's talk.

Free quote on your kitchen.

We'll come measure, listen, and follow up with a detailed quote within 7 days. No deposit, no obligation.

Book consultation or call (650) 787-6739
CallFree consultation · Same-week availabilityBook